News

Internal Hydraulic water coil

Our HR Global ECO and Total equipped with an internal water post- heating coil (NV) will now have its side panel (supply side) pre-drilled.

This will save time and make the installer work easier. He no longer has to drill the hydraulic connections on site. The 3-way valve will be delivered with the AHU and can be placed by the installer.

Internal Hydraulic water coil